Work on resurfacing the A12 at Kelvedon to Marks Tey has begun.

The £9m job, which started yesterday, will mean delays and lane restrictions until December, warned the Highways Agency .

Two lanes will be open in each direction during the day, and a contra-flow system will operate round the clock with a 40mph speed limit.

The road will be reduced to one lane most nights.

The job will create a quieter surface, new and bigger lay-bys, better drains and a hard strip on both sides of the carriageway.

Published Tuesday September 21, 2004

Brought to you by the Essex Chronicle